Office: 213, Building: 1728,
BUDAIYA ROAD, BARBAR 520
Sat - Thu: 8:00-17:00
FRIDAY : HOLIDAY
LARGER SPAN WITH FLAT SLAB
The Post-tensioning design and detailing provides maximum span ratio with lesser thickness of slab and without beams obstruction for MEP services. The floor to floor clear height increased by Post-tensioning.
Learn MoreSTABLE STRUCTURE & CRACK FREE
Post-tensioning systems are generally mandatory for bridges and due to strong tensile forces of the strands and more stronger than conventional structure and the pre-compression force controls crack.
Learn MoreRAPID CONSTRUCTION
The light weight design and lesser reinforcement and flat formwork design increase the productivity for the construction. The early removal (4 days) of work increase construction speed and form work rental cost.
Learn MoreLESS MANPOWER AND LESS RISK
The construction work can be managed with less manpower and reduction labours reduces constrution risks. Less operations saves construction time and cost and helps health, safety and environment risk.
Learn MoreADVANCED TECHNOLOGY SAVE'S MONEY & TIME
Less reinforcement steel, Less concrete, Less formwork, Less installation time, Less manpower, Less materials shifting operations, Less supervison, Simplified detailing saves time and cost.
Learn MoreLESS AXIAL FORCE FOR FOUNDATION
The post-tensioning design reduces structural weight of the building which is provides cost savings in the foundation elements and less weight structure reduces axial forces in the foundation.
Learn More